top of page

TOWPATH TRAIL

Cleveland, OH

CLIENT | Cleveland Metro Parks

DATE | 2019

MARKET | Trails & Greenways

​

*work completed at C|S|S. Emily was the landscape architect for the schematic design through construction documentation phases of this project while at C|S|S. 

PROJECT SUMMARY

A segment of the Towpath Trail was designed to connect with the section developed as part of the Innerbelt Bridge Project in Cleveland, OH. Collaborating with the Tremont neighborhood and local stakeholders, the design team created a corridor that smoothly transitions from suburban to urban conditions. The trail integrates with the neighborhood through overlooks, outdoor seating, parklets, repurposed materials, and art elements, becoming a valuable community resource for residents and visitors alike.

bottom of page