top of page

NEPONSET RIVER GREENWAY

Boston, MA

CLIENT | MA Dept of Conservation & Recreation

DATE | 2017

MARKET |Trails, Greenways

*work completed at C|S|S. Emily was the landscape architect for the construction documentation and construction administration phases of this project while at C|S|S. 

PROJECT SUMMARY

The Neponset River Greenway was developed based on the Master Plan completed in fall 2006 for the Massachusetts Department of Conservation and Recreation. The project features a multi-use pathway system along the Neponset River, a bridge crossing, and connections to parks and open spaces. Key elements include the design of a primary pathway, canopy walk, two bridges, site plantings, furniture, and water access. Trail construction was completed in fall 2017.

bottom of page