top of page




1/8
NEPONSET RIVER GREENWAY
Boston, MA
CLIENT | MA Dept of Conservation & Recreation
DATE | 2017
MARKET |Trails, Greenways
*work completed at C|S|S. Emily was the landscape architect for the construction documentation and construction administration phases of this project while at C|S|S.
PROJECT SUMMARY
The Neponset River Greenway was developed based on the Master Plan completed in fall 2006 for the Massachusetts Department of Conservation and Recreation. The project features a multi-use pathway system along the Neponset River, a bridge crossing, and connections to parks and open spaces. Key elements include the design of a primary pathway, canopy walk, two bridges, site plantings, furniture, and water access. Trail construction was completed in fall 2017.
bottom of page